Built in a freight depot,
run like one
In 2009, Ray Delgado signed a lease on a brick freight depot beside the old switchyard tracks in the West Bottoms, hung a two-post lift, and painted one rule on the office wall: the customer sees the same numbers the tech sees.
Seventeen years later the shop runs six bays, four ASE Master techs, and a small used-car lot out front, and the rule hasn't moved. Estimates arrive in writing with photos. The diagnostic fee comes off the repair. And when a car isn't worth fixing, we say so, even when the honest answer costs us the ticket.
The name comes from the ground under the building. A switchyard is where rail cars got sorted onto the right track, one at a time, by people who knew exactly what they were doing. We think that's the whole job description.